Motorway E-75, Section Dobanovci – Bubanj Potok, Sector 4
Location: Serbia
Value of Project: EUR 65 million
Construction period: August 2006 – December 2008
Description of works: Description of works: Construction of the Motorway Section, length 7.7км. The works include construction of: Basic roadway; 2 tunnels; Interchange Orlovača; Local roads; Bridges in the base of roads and interchanges; Landslide remedial measures.