Motorway E-75, Section Dobanovci Bubanj Potok, Sector 4

Location: Serbia

Value of Project: EUR 65 million

Construction period: August 2006 – December 2008

Description of works: Description of works: Construction of the Motorway Section, length 7.7км. The works include construction of: Basic roadway; 2 tunnels; Interchange Orlovača; Local roads; Bridges in the base of roads and interchanges; Landslide remedial measures.