Motorway E-75, Corridor10: BC Horgos- Novi Sad, BC Kelebija-Subotica south interchange

Location: Serbia

Value of Project: EUR 13,2 million

Construction period: May 2010 – December 2011

Description of works: Construction of the Motorway Section, length 17.4 кm, with: 225.466m3 of mechanical excavation, 342.055m3 of embankment, 106.648m3 layers made of crushed lime stone aggregate, 82.253 t asphalt works, 178m3 concrete in bridge L=35m long.