Railway Lines
On the territory of former Yugoslavia we have constructed 55 km of railway lines.
The most complicated works have been executed on "Belgrade-Bar" railway and on Belgrade railway junction.
A number of auxiliary structures have been constructed on these railways such as concrete retaining walls, underpasses and overpasses, concrete culverts, soil drainage systems, corrections and regulations of flows as well as short-span bridges.
Project sections were very difficult to access, which is evidenced by the fact that tunnels constitute 60% of total length of completed railway lines.
In addition to traffic maintenance during works on "Belgrade-Bar" railway line, the company also carried out protection works on a large number of unstable side slopes of high cuts.